How to waterproof a walk-on terrace

A terrace that drips into the flat below does not always need major work. It depends on where the water gets in, and you can find that out before lifting a single tile.

First: where is the water getting in

Before choosing a system you need to know what is failing, because the answer changes completely.

A useful clue: if the stain below always appears in the same place and lines up with a wall, it is almost certainly the junction and not the whole surface.

Without lifting the floor

If the tiling is sound and well bonded, there are two routes that avoid major work.

**Liquid polyurethane membrane.** Rolled straight onto the existing tile after cleaning and priming, it forms a continuous, elastic skin. It is the most used option today: no joints, it follows corners and drains, and it copes well with movement. It needs two or three cross-laid coats and, if it will get heavy foot traffic, a protective top coat.

**Flexible waterproofing mortar.** Applied with a trowel or brush, in two coats with reinforcing mesh at the junctions. It leaves a harder finish than polyurethane and can be tiled over.

In both cases the rule is the same: the waterproofing **has to run up the wall** by at least 15 or 20 centimetres, and go properly into the drain. What fails is almost never the middle of the terrace, it is the edge.

Lifting the floor

If there is widespread damp or the tiling is loose, there is no shortcut. Everything comes off and is rebuilt:

Expansion joints

A terrace in the sun expands and contracts every day. Without joints the floor tents or blows, and the waterproofing underneath goes with it.

You need a joint all the way round the perimeter, against the walls, and intermediate joints dividing the surface into bays of about 15 to 20 square metres. They are not optional.

What to bear in mind in Menorca

**The sun.** A dark finish can exceed 70 °C in summer. The lighter it is, the less movement and the less work for the material.

**The salt.** Near the sea the air attacks mortars and reinforcement. Choose products rated for marine environments, and do not skimp on finishing the perimeter.

**When to do it.** Not with rain forecast in the next 24 to 48 hours, and not in full August sun with the surface baking: the product dries before it cures. Spring and autumn are the good seasons.

Mistakes that keep happening

We will tell you what you need