Types of mortar, mixes and how to prepare it

Almost every problem with mortar comes down to two things: picking the wrong one, or adding extra water so it flows better. Both are avoided by knowing what you are mixing and what for.

How it differs from concrete

The difference is the coarse aggregate.

**Mortar** is cement, fine sand and water. It beds, fills and renders, but it is not meant to carry load.

**Concrete** also contains gravel. That gravel is what gives it structural strength, which is why a slab, a footing or a column is made of concrete and never of mortar.

A third word that gets mixed up with both: **cement** is only the powder in the bag, the binder that makes everything else stick.

The mortars people actually use

**Bedding or bricklaying mortar.** The traditional one, cement and sand. For laying block and brick, and for bedding units.

**Bastard or cement-lime mortar.** It also contains lime. It is more plastic, far nicer to work with and lets the wall breathe, which makes it the right choice in restoration and traditional construction, where a cement-only mortar damages the stone.

**Tile adhesive (cementitious adhesive).** For fixing ceramics. It is not a bedding mortar: it is formulated to bond to a smooth surface and goes on in a thin bed.

**One-coat render.** A facade render that acts as both undercoat and finish, and comes ready coloured.

**Self-levelling compound.** Very fluid, spreads out on its own and finds its own level. For preparing floors before a covering.

**Repair mortar.** Thixotropic, stays put on vertical and overhead surfaces without slumping. For making good damaged concrete.

**Renovating render.** Porous, lets moisture evaporate out of the wall and holds the salts. For rising damp.

**Refractory mortar.** Withstands high temperatures. For chimneys, ovens and barbecues.

The traditional mixes

They are expressed as parts of cement to parts of sand.

That said: most jobs today are done with bagged ready-mixed mortar, batched at the factory. It costs a little more per square metre and is almost always worth it, because the result is the same on Monday as on Friday.

How to mix it

Water: the mistake that ruins everything

Adding extra water is the easiest thing to do and the most expensive. Mortar with too much water flows better and feels easier, but:

The quantity on the bag is not a suggestion. If the mortar will not flow, something else is wrong: usually the substrate is dry and is drawing the water out, and that is fixed by dampening or priming it first.

Two more things

**Pot life.** Once mixed you have a while to use it, usually one or two hours. After that it cannot be “revived” by adding water: what comes out of that will not bond.

**Cold and heat.** Below 5 °C setting stops; above 30 °C, or in wind, mortar dries before it sets and ends up dusty. In summer in Menorca it pays to work first thing and to dampen the substrate.